I took this image Wednesday evening at our homesite. Sunset, looking east at the near-full moon and a spectacular rainbow:

On Wednesday, Brent wrapped up getting the forms ready, and Tim wrapped up the cutting for our power line. Today was partly cloudy and very breezy, but the good news is we poured the foundation walls today. It all went very well; The one challenge we will have is that the drop from the foundation to the leach field will require a pump-up for our future basement bathroom. not a show-stopper, but this will add some cost. This evening, I met with Jeb Harris at the site. He was dropping off the blue-board insulation which we will use to wrap the foundation. Lor and I will tackle that project next week. Meanwhile, Jeb will be working with Paul our plumber to lay the radiant system in the basement floor, in preparation of the slab pour. Over the next few days, we expect to accomplish the following:
- Clean up cutting for power, and schedule Lyndonville electric for installation.
- Call regarding homeowners insurance.
- Schedule well drilling.
No comments:
Post a Comment