Above, I'm sitting on the heater, taking a break from painting the stairwell.
Jeb Harris, our lead carpenter, working on the box to hide the electrical meter. Bluff, the dog to the right, is Jason's lab.
The north side of the house is now completely sided. Acutally, the siding is nearly complete, and will be wrapped up today (Wednesday).I took Tuesday off to help Loralee wrap up painting. Almost there- just need to finish the master bedroom, and two bathrooms. I spent most of the day in the vaulted stairwell, which was a real bear. Also, we had our propane tank installed (underground), and the leach field is almost done. We've been pushing Michael to get the heater done by the end of the week, so the flooring can go in next week. He should be able to do it.